17 16
13
15
12
14
23
18
2
1
17,7 cm
4 %
2 %
Sloping in
installation direction
Water draining
for drainage system
Max. 65 cm
Max. 50 cm
Ventilation
from below
Keep the minimum distance of
4 cm to upright, fi xed components.
CLOSED DECK
Hint:
Do not use WAVE barefoot boards for
installation as closed deck.
FIX STEP SYSTEM
4 cm
distance from
edge plate DUO
to fi xed
components
Max. 50 cm
distance between
the axes of all
plates in installation
direction of the
boards
Floor plan substructure
Distance between all
plates in installation
direction
max. 65 cm
Set connection clip crosswise in the
centre between plates
8
Hint:
The FIX STEP system does not
create the sloping of the terrace.
Attention:
Since the FIX STEP connection clips are
only used to secure the boards in vertical
position, they must be fixed to the
construction planks in every third row of
boards after inserting the groove strip by
means of the supplied screws.
Preliminary work
1. Prepare base grade exceeding the
planned terrace surface by 50 cm on all
sides with a sloping of 4 % and install
drainage in the ground.
2. Make a stable gravel or ballast bed
(frost-safe) with 2 % sloping. Then cover with
fine gravel to level uneven spots.
Sub-structure
3. To begin, click the FIX STEP mounts at
the same height level into all FIX STEP
plates. Then click the FIX STEP comfort
pads with the matching attachment piece
into them. Then stick a piece of retaining
band onto the centre of the attachment pie-
ces.
→ Cf. page 13
4. Place the FIX STEP edge plates DUO
at a distance of 4 cm parallel to upright
components and at an axis distance of max.
65 cm. Distribute FIX STEP plates parallel
to these at an axis distance of 50 cm. At the
end of the terrace, place FIX STEP edge
plates DUO again.
→ Cf. floor plan substructure
5. To minimize protruding of the const-
ruction planks, turn the FIX STEP plates.
6. For a terrace length of more than
360 cm, a FIX STEP edge plate must be
placed in the area of the end joint of the
smooth-edge boards.
Max. 50 cm Max. 50 cm
1cm
32 cm
7. Click construction plank (40 × 60 mm)
into the FIX STEP attachment pieces with
the grooves down.
8. For a terrace width of more than
360 cm, the ends of the construction plank
must always be offset to each other. To do
so, connect the ends of the planks with a
FIX STEP connection clip adjusted to
32 cm and screw on to one side. Maintain a
distance of 1 cm between the construction
planks.
→ Cf. floor plan substructure 8
32 cm
15,5 cm1cm
7cm
10. Then exactly align all construction
planks on the side where installation of the
boards begins.
11. After installing the construction planks,
check the position of the FIX STEP plates
and adjust them if necessary.
12. Place perforated tape below the
construction planks and screw it onto all
construction planks by means of the FIX
STEP connection clip. The perforated tape
is used for bracing the terrace.
→ Cf. 12
I
III
II
M6
x16
4x35
13. To attach the FIX STEP edge clamps,
cut out the construction planks first only on
the side from where the boards are to be
installed, 12 cm away from the edge, 5 mm
deep and 2mm deep.
After that, the two-part FIX STEP edge
clamp is fitted into this groove and to the
construction plank by means of pliers.
→ Cf. 13
I
5 mm
12 mm
IV
V
II
III
14. To prevent subsequent slipping of the
boards, self-adhesive retaining tape must
always be fastened to the construction
plank that is closed to the centre of the
boards.
→ Cf. 14
Installation of the boards
15. The first board is pressed into the
positioned edge clamps. Keep a distance of
2 cm to upright, fixed components. When
using the optional house connection profile,
first insert the board, then position it.
→ Cf. 15
16. First, insert groove strip loosely into
the board groove (do not stretch or tighten).
17. The connected FIX STEP connection
clips are then set onto the each of the
construction planks, pushed under the
groove strip against the board and engaged
by means of pliers.
I II
III
IV
18. If boards are to be fastened at a
distance of about 10 mm to the ends of the
construction planks, it is necessary to
insert groove bridges before the
connection clips are mounted.
II
I
19. After installation of three rows of boards,
the deck should be measured so that
parallel installation is ensured. Attention:
Since the FIX STEP connection clips are
only used to secure the boards in vertical
position, they must be fixed to the const-
ruction planks in every third row of boards
after inserting the groove strip by means of
the supplied screws. Repeat procedure
until the last but one board is installed.
3
6
20. Then determine the length of the
construction planks and saw them off to
be flush.
21. Then create the groove for the edge
clamp and finish installing the boards.
→ Cf. installation step 13
22. Now cut the front end of the boards in
the area of the edge to length with boards
extending 1.5 cm over the construction
planks and bevel the cutting edge.
23. When using a dual smooth-edged
board, construction planks pieces of 8 cm
must be screwed onto the construction
plank with an assembly clip. In the corners
of the terrace, dual assembly clips are
required to install the smooth-edged plank
to the longitudinal side and the front side.
Also press in the FIX STEP smooth-edged
edge plate DUO, so that the dual assembly
clip can hang freely.
→ Cf. 23
II
4x35
I
III
4x35
1,2cm
8cm
Cut smooth-edged boards to length
parallel to the boards; the smooth-edged
board on both ends of the terrace must be
1.2 cm shorter than the construction plank.
6cm
1,2cm
Hold on smooth-edged board and drill to-
gether with the construction plank using ∅
7 mm drill holes.
24. Keep the maximum distance of 6 cm to
the ends and 50 cm between drill holes.
Then re-drill smooth-edged boards with
∅ 10 mm, lower and attach by means of
screw, washer and nut using a distancing
groove of 1 cm to adjust to the terrace
deck.
1cm1,5cm
4cm
1,5cm
Min.
1,5cm
M8x80
25. Cut smooth-edged boards parallel
to the substructure and drill together with
the construction plank with ∅ 7 mm. Re-drill
smooth-edged boards with ∅ 10 mm and
install them.
M8x80
1cm